Ocean Drilling Program | Integrated Ocean Drilling Program | International Ocean Discovery Program
 

Technical Reports

Report Web
Publication
Date
Original
Publication
Date

Technical Report 1

Operations Resumes
doi:10.2973/dsdp.tr.1.1971

July 2007 October 1971
Technical Report 2

Re-Entry
doi:10.2973/dsdp.tr.2.1971

July 2007 November 1971
Technical Report 3

Dynamic Positioning
doi:10.2973/dsdp.tr.3.1971

July 2007 December 1971
Technical Report 4

Drill String: Drill Pipe, Bumper Subs, Drill Collars, and Coring Equipment
doi:10.2973/dsdp.tr.4.1972

July 2007 April 1972
Technical Report 5

Operations Resumes-Part II
doi:10.2973/dsdp.tr.5.1972

July 2007 October 1972
Technical Report 6

Core Bits
doi:10.2973/dsdp.tr.6.1974

June 2007 April 1974
Technical Report 7

Operations Resumes-Part III
doi:10.2973/dsdp.tr.7.1974

July 2007 April 1974
Technical Report 8

Operations Resumes-Part IV
doi:10.2973/dsdp.tr.8.1976

July 2007 March 1976
Technical Report 9

Soils Study Continental Margin Sites
doi:10.2973/dsdp.tr.9.1976

July 2007 August 1976
Technical Report 10

Operations Resumes-Part V
doi:10.2973/dsdp.tr.10.1977

July 2007 August 1977
Technical Report 11

Operations Resumes-Part VI
doi:10.2973/dsdp.tr.11.1980

July 2007 March 1980
Technical Report 12

Design and Operation of the Hydraulic Piston Corer
doi:10.2973/dsdp.tr.12.1983

July 2007 May 19983
Technical Report 13

Reentry Cone Multiple Casing Hanger Systems
doi:10.2973/dsdp.tr.13.1984

July 2007 January 1984
Technical Report 14

Drill String Failure Analyses
doi:10.2973/dsdp.tr.14.1983

July 2007 November 1983
Technical Report 15

Test and Evaluation of Aluminum Drill Pipe for Deep Water Coring
doi:10.2973/dsdp.tr.15.1984

July 2007 February 1984
Technical Report 16

Design and Operation of a Wireline Pressure Core Barrel
doi:10.2973/dsdp.tr.16.1984

July 2007 March 1984
Technical Report 17

Design and Operation of Mechanical and Hydraulic Bit Releases
doi:10.2973/dsdp.tr.17.1984

July 2007 February 1984
Technical Report 18

Operations Resumes Part VII: Leg 71 through 84
doi:10.2973/dsdp.tr.18.1984

July 2007 April 1984
Technical Report 19

Operations Resumes Part VIII: Leg 85 through Leg 96
doi:10.2973/dsdp.tr.19.1984

July 2007 April 1984
Technical Report 20

Design and Operation of an Extended Core Barrel
doi:10.2973/dsdp.tr.20.1984

July 2007 August 1984
Technical Report 21

Design and Operation of an Advanced Hydraulic Piston Corer
doi:10.2973/dsdp.tr.21.1984

July 2007 July 1984
Technical Report 22

Computer Analysis and Field Measurements of Stresses in Long Drill Strings Suspended from a Floating Vessel
doi:10.2973/dsdp.tr.22.1984

July 2007 July 1984
Technical Report 23

Operations Plan
doi:10.2973/dsdp.tr.23.1984

July 2007 February 1984